m/v Philip Essberger![2012 & 2013 Philipp Essberger 300x185 2012 & 2013](http://www.navikon-engineering.pl/wp-content/uploads/2014/09/Philipp-Essberger-300x185.jpg)
Date: July 2013
Scope of work: MAN B&W 6L42MC , work performed in Świnoujście, in cooperation with Morska Shipyard
m/v Cellus
Scope of work: Volvo Penta TAMD 74 C-A EDC
– Fuel system repair / rebuilding
– Complete diagnostic by VODIA tool
Pilot 64
Scope of work: Volvo Penta TAMD 74 C-A EDC
– Fuel system repair / rebuilding
– Complete diagnostic by VODIA tool
m/v Express 1
Scope of work: MaK 552 AK
– Rebuilding of the engine
– Crankshaft and bed plate replacement Volvo Penta D16
– Installation of new parameter monitoring system by Volvo
m/v Danio![2012 & 2013 danio 300x225 2012 & 2013](http://www.navikon-engineering.pl/wp-content/uploads/2014/05/danio-300x225.jpg)
Date: May/July 2013
Scope of work: 2 psc VOLVO PENTA TAMD163A overhaul, including crankshaft exchange, work performed in Świnoujście
m/v Enquest Producer![2012 & 2013 enquestproducer 300x225 2012 & 2013](http://www.navikon-engineering.pl/wp-content/uploads/2014/05/enquestproducer-300x225.jpg)
Date: March/July 2013
Scope of work: switchboards prefabrication and cable laying of FPSO Enquest Producer, work performed in Scotland and Germany, as subcontractor for WARTSILA
m/v Key Marmara![2012 & 2013 keymarmara 300x189 2012 & 2013](http://www.navikon-engineering.pl/wp-content/uploads/2014/05/keymarmara-300x189.jpg)
Date: April 2013
Scope of work: MAN D2842 LE 301, work performed in Swinoujscie, in cooperation with Morska Shipyard
m/v B Gas Lydia![2012 & 2013 lydia 300x225 2012 & 2013](http://www.navikon-engineering.pl/wp-content/uploads/2014/05/lydia-300x225.jpg)
Date: February 2013
Scope of work: MAN B&W 6l28/32A cylinder heads overhaul, in cooperation with Gryfia Shipyard
m/v Aquarius
Scope of work: overhaul engine MWM TBD 306 V12
m/v Sierra Leyre![2012 & 2013 sierraleyre 150x150 2012 & 2013](http://www.navikon-engineering.pl/wp-content/uploads/2014/05/sierraleyre-150x150.jpg)
Date: January 2013
Scope of work: installation of shaft generator
m/v Sierra Modoc![2012 & 2013 sierramodoc 150x150 2012 & 2013](http://www.navikon-engineering.pl/wp-content/uploads/2014/05/sierramodoc-150x150.jpg)
Date: January 2013
Scope of work: steel repairs
Victor Hensen
Place of service: Kirkenes
Scope of work:
– transportation opening from ER to open deck,
– removal of old 2off MTU engines,
– fitting of new engines incl shaft alignment,
– rebuilding of foundations,
– rebuilding of electric system,
– rebuilding of pipelines like: cooling, exhaust, fuel
– installation of LCD steering panels in ECR and wheelhouse
m/v Peter Pan
Date: January 2012
Scope of work: Steering gear repair
Place of service: Trelleborg
m/v Nina![2012 & 2013 nina1 150x150 2012 & 2013](http://www.navikon-engineering.pl/wp-content/uploads/2014/05/nina1-150x150.jpg)
Date: January 2012
Scope of work: Main engine works on MaK motor
Place of service: Reimersvaal shipyard/Holland
m/v Merchant
Date: January 2012
Scope of work: Main engine assembling. Motor type: Sulzer Z40
Place of service: Rostock